Trade-offs stay visible.
Cost and carbon stand side by side. A lower footprint can carry a higher price.
Make products worth keeping,and a brand worth coming back to.
Climacope / Product Redesign Program
No BOM needed for the call · Sprint from $7,500

I / Use less
Baseline: This generic massage gun starts with a unit cost of $74.00 and carbon emissions of 18.40 kg CO₂e per unit.

Thinner walls, internal ribs and integrated brackets save $4.15 and 1.45 kg CO₂e per unit, and remove 11 parts.

Post-consumer recycled PC-ABS replaces virgin plastic in the grip, cutting 0.60 kg CO₂e for $0.30 more per unit.

Recycled aluminium cuts 3.60 kg CO₂e for $0.65 more per unit. A second factory could cut 1.80 kg more; its cost needs a quote.

II / Keep it working
Proposed: a click-in battery the owner replaces whole, and screw-mounted motor modules, for $3.70 more per unit. Spare parts keep it running for seven years.

III / Ship lighter
USB-C with no charger, and a pulp insert instead of foam, save $5.20 and 1.65 kg CO₂e per unit, and fit 128 units on a pallet instead of 96.

Quantified so far: −$4.70 and −9.10 kg CO₂e per unit. Quotes, two carbon effects and your sign-off are still open.

The decision / Every trade-off visible
These are illustrative assumptions, not client results. Click a figure to inspect its assumption record. A real project connects it to your invoice, quote or supplier evidence.
| Change | Unit cost | One-time cost | Carbon per unit | Owner / next requirement |
|---|---|---|---|---|
| Less material | Needs client sign-offNone yet | ModelledNone yet | Needs client sign-offNone yet | Client engineeringStrength, vibration and fatigue qualification |
| Fewer parts | ScreenedNone yet | Needs supplier quoteNone yet | ScreenedNone yet | Client engineeringClient assembly data and tooling quote |
| Recycled plastic | ModelledNone yet | Needs supplier quoteNone yet | ModelledNone yet | SourcingQualified grade (impact, heat near the battery, skin contact), recycled-content certificate and supplier quote |
| Recycled aluminium | ModelledNone yet | Needs supplier quoteNone yet | ModelledNone yet | SourcingQualified grade, matched EPD and supplier quote |
| Factory change | Needs supplier quoteNone yet | Needs supplier quoteNone yet | Needs supplier quoteNone yet | SourcingSupplier EPD, quote and client commercial confirmation |
| Replaceable battery | Needs client sign-offNone yet | Needs supplier quoteNone yet | Not assessedNone yet | Client engineeringElectrical / battery safety, tooling and firmware approval |
| Modular motor + spares | ProposedNone yet | Needs supplier quoteNone yet | Not assessedNone yet | Program ownerStocking plan, repair guide and seven-year commitment |
| What ships in the box | ModelledNone yet | Needs supplier quoteNone yet | ModelledNone yet | ProductPackaging quote, transit tests and charging specifications |
| Battery QR code | Required on every battery from 18 February 2027 (EU Battery Regulation 2023/1542, Art. 13(6)). The wider owner information page is optional. Open the concept product information ↗ | Product + legal reviewWording and scope need legal review before launch | ||
| Quantified effects only | ModelledNone yet | ModelledNone yet | Needs supplier quoteNone yet | Incomplete subtotal. Excludes all unknown effects. Includes −1.80 kg CO₂e from the factory change, which still needs a supplier quote. |
| Complete total + contingency | Not assessedNone yet | |||
| Payback | Not assessedNone yetNeeds complete implementation cost, stock costs, production volume and timing. | |||
Cost and carbon stand side by side. A lower footprint can carry a higher price.
Unknown is marked unknown. Incomplete inputs never become a complete total.
Inspect every assumption. In a real engagement, follow it to the source document.
Engineering, firmware and commercial approvals stay with their named owners.
Awaiting client sign-offThe functional unit is one finished, packaged massage gun delivered to an illustrative distribution centre. The baseline is ModelledNone yet and ModelledNone yet. The boundary includes materials, manufacturing, packaging and inbound freight; use, repair, end of life, tax and retail margin are excluded. Changes are authored additive assumptions on a shared baseline, with no overlapping savings intended. There are no actual client invoices, quotes or supplier EPDs. Actual interactions between changes must be evaluated with the client’s BOM and suppliers. Product performance and regulatory suitability are unverified.
How you start / Three steps
The sprint covers material substitution, recycled content and dematerialization. Repair, packaging and the other levers in this example follow in the monthly program.
A 20-minute conversation to check fit. No BOM required beforehand.
Paid before kickoff: a baseline, three levers compared and a business case you keep. About 4 weeks on Starter.
Starter, Pro or Enterprise, by SKU scope. Prepaid, month to month. No fee at production and no share of your savings.
Your product / Your decision
A request starts a conversation, not a confirmed booking.
See how the program works →Illustrative example · Fictional inputs · Known effects only · includes estimates awaiting a supplier quote